Rough-in plumbing is the supply and drain piping installed in walls and floors before the walls are closed, and many plumbers quote it by the fixture. This rough-in plumbing cost per fixture calculator multiplies your fixture count by the rate you were quoted, then adds any permit and inspection fee. The $450 rate it opens with is a placeholder, so replace it with a number from a real quote.
Rough-In Plumbing Cost Per Fixture Calculator
Rough-in plumbing cost from the number of fixtures (sinks, toilets, tubs) and a per-fixture rate.
How do you calculate rough-in plumbing cost per fixture?
Multiply the number of fixtures by the cost per fixture, then add the permit and inspection amount.
Total = Fixtures × Cost per fixture + Permit and inspection
Where:
- Fixtures = the count of sinks, toilets, tubs, showers and similar connections to be roughed in
- Cost per fixture = the rate your plumber quotes for each one
- Permit and inspection = a single amount, or 0 if none applies
Worked examples
Worked example: the calculator’s starting values
Six fixtures at $450 each, with no permit entered:
Total = 6 × 450 + 0 = $2,700
Worked example: a bathroom, kitchen and laundry
Five fixtures (toilet, vanity sink, shower, kitchen sink, washing machine hookup) at $600 each, plus a $150 permit and inspection fee:
Total = 5 × 600 + 150 = $3,150
Worked example: a larger remodel
Eight fixtures at $500 each with a $300 permit fee:
Total = 8 × 500 + 300 = $4,300
Fixture count and total compared
At a fixed rate the total rises in a straight line. The table uses the $450 starting rate and no permit fee.
| Fixtures | Total |
|---|---|
| 4 | $1,800 |
| 6 | $2,700 |
| 8 | $3,600 |
| 10 | $4,500 |
A per-fixture rate is an average. A toilet, a tub and a washing machine hookup do not cost the plumber the same to rough in, so when your quote lists each fixture separately, add them one by one instead of using a single average.
What is rough-in plumbing?
Rough-in is the first stage of plumbing in a new build or a major remodel. The plumber runs drain, waste, vent and water supply lines to the position of each future fixture and leaves them capped or stubbed out. Walls and floors are closed over them afterwards. Whether an inspection is required before the walls are closed depends on your local building department, so ask them before work starts.
What counts as a fixture
A fixture is any point where water is supplied or drained: a sink, toilet, bathtub, shower, bidet, washing machine connection or similar. Count each one separately. Fixtures that sit close together, such as a back-to-back bathroom and kitchen, can share runs of pipe, which is why layout affects the price your plumber gives you.
What the rough-in plumbing cost per fixture calculator leaves out
The result covers rough-in only. It does not include the fixtures themselves, faucets and trim, or the finish plumbing done after the walls are closed. It also does not add water heaters, repiping an existing system, trenching to the street, or repairs to anything hidden behind existing walls. Ask your plumber which of these are inside the per-fixture price.
Comparing plumbing quotes
Ask each plumber for the fixture count they assumed, the rate for each, and whether permits are included. Enter the same fixture count into the calculator for each rate and compare the totals. A lower per-fixture rate can still cost more if the quote leaves out permits or has a separate charge for hard-to-reach runs.
Rate and total compared
For six fixtures with no permit amount:
| Cost per fixture | Total |
|---|---|
| $350 | $2,100 |
| $450 | $2,700 |
| $550 | $3,300 |
| $650 | $3,900 |
A permit and inspection amount is added once, not per fixture. For six fixtures at $450, a $250 permit takes the total from $2,700 to $2,950.
Worked example: turning an itemised quote into one rate
Suppose your plumber lists five fixtures separately: a toilet at $450, a vanity sink at $400, a shower at $650, a kitchen sink at $500 and a washing machine hookup at $450, with a $175 permit.
Fixture total = 450 + 400 + 650 + 500 + 450 = $2,450
Average rate = 2,450 ÷ 5 = $490
Total = 5 × 490 + 175 = $2,625
The calculator gives the same $2,625 once you enter 5 fixtures at $490 and a $175 permit.
How do you count the fixtures for a project?
List every point where water is supplied or drained, room by room. A typical bathroom might include a toilet, a sink and a shower or tub. A kitchen might add a sink, and a laundry area a washing machine connection. Ask your plumber how they count items such as a double sink, a dishwasher or an ice maker line, then enter their count so the calculator matches the quote.
Prices for individual fixtures
Fixture ranges
A faucet runs $230 to $480, a toilet $350 to $3,500, a sink $300 to $5,500, a bathtub $500 to $2,750 and a shower $1,500 to $3,500. A bidet is $1,500 to $2,900. The $450 starting rate fits the faucet, toilet, sink and bathtub ranges, but it is below the shower range.
Labour, permits and moving fixtures
Three costs decide how far a quote moves from the per-fixture rate.