A modular home is priced in two parts, the factory-built modules and everything it takes to finish the home on your site, and this modular home cost calculator adds them. Enter the floor area, the factory price per square foot, the site work, foundation and delivery, and the finishing and hookups, and the calculator returns the estimated total.

Mobile & Manufactured Homes Calculators

Modular Home Cost Calculator

Total cost for a modular home from floor area, a per-square-foot build price, and site work.

Factory-built module price, before site work.
$
$

The starting values are 1,600 ft² at $90 per ft², $30,000 for site work, foundation and delivery, and $15,000 for finishing and hookups. They are placeholders, so use quotes for your own site. Land is not included.

How do you calculate the cost of a modular home?

Multiply the floor area by the unit price, then add the site work and the finishing costs.

Total = Floor area × Unit price + Site work, foundation & delivery + Finishing & hookups

Where the unit price is the factory module price before site work, so do not enter an all-in turnkey price or the site costs will be counted twice.

Worked example: the starting values

Modules = 1,600 × 90 = $144,000
Site and finishing = 30,000 + 15,000 = $45,000
Total = 144,000 + 45,000 = $189,000

Dividing 189,000 by 1,600 ft² gives about $118 per ft² all in, with the site and finishing costs making up 23.8% of the total.

What do site work, foundation and delivery cost?

Adding it up for 1,600 ft²

The table treats the home as a single-storey on a foundation the same size as its floor area, with municipal water, a sewer connection, electrical work and permits, and no gas line.

Foundation type Foundation Delivery Hookups and permits Total
Slab $8,000 to $25,600 $8,000 to $16,000 $4,000 to $16,700 $20,000 to $58,300
Basement $32,000 to $59,200 $8,000 to $16,000 $4,000 to $16,700 $44,000 to $91,900

The $45,000 starting total for site work and finishing is inside the slab range and near the bottom of the basement range. With a basement and a well instead of municipal water, it would be too low, so replace it with real quotes.

How floor area, unit price and site costs change the total

The first table keeps the $90 unit price and the $45,000 for site work and finishing and changes the floor area.

Floor area Modules Total All in per ft²
1,200 ft² $108,000 $153,000 $127.50
1,600 ft² $144,000 $189,000 $118.13
2,000 ft² $180,000 $225,000 $112.50

The all-in price per square foot falls as the home gets larger, because the site costs are spread over more floor area. This is a feature of the arithmetic, not a market claim, and your own quotes will show how the real site costs behave.

The factory unit price

With 1,600 ft² and $45,000 of site work and finishing, a unit price of $80 gives $173,000, $90 gives $189,000 and $100 gives $205,000. Each $10 per ft² changes the total by $16,000.

The site and finishing costs

These are the figures that vary most from one lot to the next. Holding the modules at $144,000, site work and finishing of $20,000, $45,000 and $90,000 give totals of $164,000, $189,000 and $234,000. A sloping lot, a long driveway, a well and a septic system, or a basement can all push this line well above the starting figure, which is why it deserves its own quote.

What to keep out of the unit price

Enter only the factory price of the modules. If a builder quotes a turnkey price, subtract the site work, foundation and finishing before you enter the unit price, or the calculator will count them twice.

Comparing builders

Divide each builder’s total by the floor area, then check that the same items are inside each quote: crane and set, foundation, utility connections, permits, porches and garages. A lower unit price with a higher site line can cost more than a higher unit price with the site work included.

Frequently asked questions

How do I calculate modular home cost per square foot?

Multiply the area by the factory price, then add site work and finishing. The starting values give $189,000 for 1,600 ft², about $118 per ft² all in.

What is the difference between a modular and a manufactured home?

Modular homes are built to the local residential code, while manufactured homes are built to the federal HUD code. That affects financing, permits and resale.

Why does the cost per square foot fall as a modular home gets bigger?

The site work and finishing are largely fixed, so they are shared across more area. At the starting values the all-in price is $127.50 per ft² at 1,200 ft² and $112.50 at 2,000 ft².

What should I enter as the unit price?

The factory price per square foot of the modules only. Put site work, foundation, delivery and finishing in their own fields.

Which cost varies most between lots?

Site work. Slope, access, water and sewer, and foundation type can each move it by tens of thousands of dollars.

Mark Danny