How the concrete volume is calculated
Volume = length × height × thickness × (1 + waste)
Bags = volume ÷ yield of one bag, rounded up
Ready-mix cost = volume in cubic yards × price per cubic yard
Where:
- The thickness is the thickness of the wall, entered in inches or any other unit.
- The waste allowance covers spillage, uneven forms and over-ordering, and it starts at 10 percent.
- The bag sizes are 40 lb (about 0.30 ft³), 60 lb (about 0.45 ft³) and 80 lb (about 0.60 ft³), taken from typical bag labels. You can also choose volume only.
- The ready-mix price is optional. Leave it at 0 to skip the cost.
Every input has its own unit selector, so you can enter feet, inches or metres. The volume is shown in cubic yards, with the other units on request.
Worked examples
The starting wall
The thickness is 8 in, which is 0.667 ft, so the wall volume is 20 × 8 × 0.667 = 106.67 ft³. Adding 10 percent waste gives 117.33 ft³. Dividing by 27 converts to cubic yards: 4.35 yd³. With 80 lb bags at 0.60 ft³ each, 117.33 ÷ 0.60 = 195.6, so 196 bags.
Adding the ready-mix price
If the ready-mix is quoted at 150 per cubic yard, the cost is 4.35 × 150 = about 652. The price is only an example, so enter your own quote. Ready-mix suppliers often have minimum loads and delivery charges that are not in this figure.
A thin, long wall in 60 lb bags
A wall 30 ft long, 4 ft high and 6 in thick has a volume of 30 × 4 × 0.5 = 60 ft³. With 10 percent waste that is 66 ft³, or 2.44 yd³. In 60 lb bags at 0.45 ft³, 66 ÷ 0.45 = 146.7, so 147 bags.
A thicker wall
A wall 10 ft long, 8 ft high and 12 in thick is 80 ft³, or 88 ft³ with waste. That is 3.26 yd³, or 196 bags of 60 lb mix.
Bags or ready-mix?
The bag count shows how many bags you would handle, and it is a useful check on whether bagged mix is realistic. A count of 196 bags of 80 lb is 15,680 lb of mix, which is a lot to mix by hand, so a wall of this size is usually poured with ready-mix delivered by truck. Small walls, short sections or patches suit bags better. The calculator shows both so that you can compare.
Choosing the waste
The 10 percent allowance is a starting value, not a rule. Forms that bulge, an uneven base, spillage and any leftover in the truck all change how much you need, so choose an allowance that suits the job and ask your supplier how they advise ordering.
Thickness matters
The volume is proportional to the thickness. Changing the wall from 8 in to 12 in raises the volume by half, so check the thickness against your plans or design before you order.
What is not included
The calculator counts the concrete in the wall. It does not include the footing, reinforcing steel, formwork, ties, openings, curing, finishing or labour. A wall with doors or windows needs the openings taken off the volume, so subtract them from the length or height by hand if they are large. A structural or retaining wall needs a design by a qualified person, since the thickness, steel and footing depend on the load and the soil. For a wall that holds back soil, with a footing, see the concrete retaining wall calculator, and for a wall built of units, see the block wall calculator.
Measuring the wall
- Measure the length along the face of the wall.
- Measure the height from the top of the footing or slab to the top of the wall.
- Use the finished thickness of the wall, not the thickness of the forms.
- Choose the bag size you will buy, or the volume only option if you are using ready-mix.
A metric example
A wall 6 m long, 2.4 m high and 0.2 m thick has a volume of 6 × 2.4 × 0.2 = 2.88 m³, and with 10 percent waste that is 3.17 m³. The starting wall of 4.35 yd³ is about 3.32 m³. Enter the metres directly, since every input has its own unit selector, and ask your supplier for the volume in the unit they sell by.
Check against the plans
Compare the result with the volume shown on the drawings, if there is one. A large difference usually means a wrong thickness or height, or that the wall on the plans has steps, pilasters or openings that this simple wall does not.
Frequently asked questions
How much concrete do I need for a wall?
Multiply the length by the height by the thickness and add a waste allowance. A wall 20 ft long, 8 ft high and 8 in thick with 10 percent waste needs 117.33 ft³, which is 4.35 yd³.
How many bags of concrete do I need?
Divide the volume by the yield of one bag. The calculator uses about 0.30 ft³ for a 40 lb bag, 0.45 ft³ for 60 lb and 0.60 ft³ for 80 lb. The starting wall needs 196 bags of 80 lb.
Does the calculator include the footing?
No, it counts the wall only. Add the footing separately, or use the concrete retaining wall calculator for a wall and footing together.
How do I convert cubic feet to cubic yards?
Divide by 27. The 117.33 ft³ starting wall is 4.35 yd³.