Retaining Wall Footing Calculator – Concrete Footing or Gravel Base

A retaining wall footing is the concrete or gravel strip the wall sits on. This retaining wall footing calculator has a concrete mode, which returns cubic feet, cubic yards and bags, and a gravel mode, which returns volume and weight.

Wall Calculators

Retaining Wall Footing Calculator

Concrete for a retaining wall footing or foundation, or gravel for a segmental wall base.

%

The starting concrete footing is 20 ft long, 24 in wide and 12 in deep with 10% waste, which gives 44 ft³, 1.63 yd³ and 74 bags of 80 lb. The starting gravel trench is 20 ft long, 24 in wide and 6 in deep, which gives 20 ft³ and 1 ton.

How is a retaining wall footing calculated?

Both modes multiply length, width and depth. Concrete adds a waste allowance and divides by the bag yield, and gravel multiplies by a density.

Concrete volume = Length × Width × Depth × (1 + Waste)
Bags = ceiling(Volume ÷ Bag yield)
Gravel volume = Length × Width × Depth
Gravel weight = Gravel volume × Density

Worked example: the starting values

Concrete = 20 × 2 × 1 = 40 ft³
With waste = 40 × 1.10 = 44 ft³
Cubic yards = 44 ÷ 27 = 1.63 yd³
Bags = 44 ÷ 0.60 = 73.3, so 74 bags
Gravel = 20 × 2 × 0.5 = 20 ft³ = 0.74 yd³
Weight = 20 × 100 = 2,000 lb = 1 ton

Width and depth are entered in inches and converted to feet. An 80 lb bag yields 0.60 ft³, and the gravel mode adds no waste or compaction allowance.

Worked examples for different footings

Worked examples

A thinner footing

Change the concrete depth to 8 in. The volume is 20 × 2 × 8 ÷ 12 = 26.67 ft³, and 29.33 ft³ with waste. That is 1.09 yd³ and 29.33 ÷ 0.6 = 48.9, so 49 bags, against 74 for the starting footing.

A longer wall

Double the length to 40 ft. The concrete is 40 × 2 × 1 × 1.10 = 88 ft³, which is 3.26 yd³ and 88 ÷ 0.6 = 146.7, so 147 bags.

Concrete without waste

Set waste to 0 and the starting footing is 40 ft³ and 1.48 yd³. The 10% waste adds 4 ft³ to what you order.

How depth and gravel thickness change the quantities

Depth is the dimension that moves the footing most, because the length and width are usually fixed by the wall. The table keeps the 20 ft length, 24 in width and 10% waste and changes the concrete depth.

Depth Volume with waste Cubic yards 80 lb bags
8 in 29.33 ft³ 1.09 yd³ 49
12 in 44.00 ft³ 1.63 yd³ 74
16 in 58.67 ft³ 2.17 yd³ 98

For long footings, ordering ready-mix by the cubic yard is usually simpler than counting bags. The bag count is mainly useful for short walls and small pours.

A thicker or thinner gravel base

The gravel mode uses the starting 20 ft length and 24 in width and a density of 100 lb per cubic foot. Changing the thickness changes the weight in direct proportion.

Gravel depth Volume Weight Tons
4 in 13.33 ft³ 1,333 lb 0.67
6 in 20.00 ft³ 2,000 lb 1.00
8 in 26.67 ft³ 2,667 lb 1.33

Gravel density varies with the stone and its moisture, so use the figure from your supplier if it differs from the default. The calculator adds no compaction allowance to the gravel mode, so allow extra if you plan to compact the base.

The footing depth and width for a real wall depend on the soil, the frost depth and the wall height. Take them from the plans, or confirm them with a local building department or engineer.

Frequently asked questions

How do I calculate concrete for a retaining wall footing?

Multiply length, width and depth in feet, add waste and divide by 27 for cubic yards. The starting footing needs 1.63 yd³.

How many bags of concrete do I need for a footing?

Divide the volume with waste by the bag yield and round up. The starting footing needs 74 bags of 80 lb.

How much concrete does a deeper footing need?

Volume rises in proportion to depth. On the starting 20 ft footing, 8 in needs 1.09 yd³, 12 in needs 1.63 yd³ and 16 in needs 2.17 yd³.

How much gravel do I need for a retaining wall base?

Multiply length, width and thickness, then multiply by the density. A 20 ft by 24 in trench 6 in deep holds 20 ft³, which weighs 2,000 lb, or 1 ton, at 100 lb per cubic foot.

Should I order bags or ready-mix for a footing?

Bags suit small pours. The starting footing needs 74 bags, and a 16 in deep footing needs 98, so ready-mix by the cubic yard is easier as the footing gets longer or deeper.

Mark Danny

Mark Danny

Mark Danny builds and maintains the free calculators and guides on Area of Irregular Shapes Calculator. Every calculator page explains its formula and shows a worked example, so you can check the working yourself. Spotted a mistake or have a suggestion? Email gulsher.hingoro101@gmail.com.