A poured retaining wall is two pours of concrete: the vertical stem and the footing under it. This concrete retaining wall calculator takes the wall length and height, the stem thickness and the footing size, adds a waste allowance and returns the concrete volume in cubic yards, plus bags if you want them.
Concrete Retaining Wall Calculator
Concrete volume and bags for a poured concrete retaining wall and its footing.
The starting values are a 20 ft wall, 4 ft high and 8 in thick, on a footing 24 in wide and 10 in deep with 10% waste. They give 3.53 yd³ and 159 bags of 80 lb.
How is concrete for a retaining wall calculated?
The calculator adds the stem volume to the footing volume and then applies the waste allowance to the total.
Stem = Length × Height × Thickness
Footing = Length × Footing width × Footing depth
Volume = (Stem + Footing) × (1 + Waste)
Bags = ceiling(Volume ÷ Bag yield)
Worked example: the starting values
Stem = 20 × 4 × 8 ÷ 12 = 53.33 ft³
Footing = 20 × 2 × 10 ÷ 12 = 33.33 ft³
Total = 86.67 ft³
With waste = 86.67 × 1.10 = 95.33 ft³
Cubic yards = 95.33 ÷ 27 = 3.53 yd³
Bags = 95.33 ÷ 0.60 = 158.9, so 159 bags
The stem-only and footing-only results are shown without waste. They are 1.98 yd³ and 1.23 yd³, so they add to less than the 3.53 yd³ total.
Worked examples for different walls
Worked examples
A thinner stem
Set the thickness to 6 in. The stem is 20 × 4 × 0.5 = 40 ft³. With the footing it is (40 + 33.33) × 1.10 = 80.67 ft³, which is 2.99 yd³. That needs 80.67 ÷ 0.6 = 134.4, so 135 bags.
A thicker stem
Set the thickness to 12 in. The stem is 80 ft³, and the total is (80 + 33.33) × 1.10 = 124.67 ft³, which is 4.62 yd³. That needs 208 bags.
How wall length and footing width change the concrete
Length is the simplest lever, because both the stem and the footing scale with it. The table keeps the 4 ft height, 8 in stem, 24 × 10 in footing and 10% waste from the starting values and changes only the wall length.
| Wall length | Volume with waste | Cubic yards | 80 lb bags |
|---|---|---|---|
| 10 ft | 47.67 ft³ | 1.77 yd³ | 80 |
| 20 ft | 95.33 ft³ | 3.53 yd³ | 159 |
| 30 ft | 143.00 ft³ | 5.30 yd³ | 239 |
Volume doubles when the length doubles, so a 30 ft wall needs three times the concrete of a 10 ft wall. The footing width has a smaller effect, because it only changes the footing part of the total.
A wider or narrower footing
This table keeps the 20 ft length and changes only the footing width. The stem stays at 53.33 ft³ and the footing depth stays at 10 in.
| Footing width | Volume with waste | Cubic yards | 80 lb bags |
|---|---|---|---|
| 18 in | 86.17 ft³ | 3.19 yd³ | 144 |
| 24 in | 95.33 ft³ | 3.53 yd³ | 159 |
| 30 in | 104.50 ft³ | 3.87 yd³ | 175 |
Each extra 6 in of footing width adds about 0.34 yd³ on a 20 ft wall. The footing size for a real wall depends on the soil, the wall height and any surcharge behind it, so take it from the plans or from an engineer rather than from this table.
What the waste allowance covers
Waste covers spillage, an uneven trench bottom, forms that bow slightly and the concrete left in the truck or mixer. A level, well-formed trench needs less than a ragged one. The percentage is your own choice, and the result changes in proportion to it.
Frequently asked questions
How do I calculate concrete for a retaining wall?
Add the stem volume and the footing volume, apply waste and divide by 27 for cubic yards. The starting wall needs 3.53 yd³.
How many bags of concrete do I need for a retaining wall?
Divide the volume by the bag yield and round up. The starting wall needs 159 bags of 80 lb.
Why is the stem plus footing result lower than the total?
The stem-only and footing-only results leave out waste. The total includes it.
How does wall length change the concrete I need for a retaining wall?
Volume scales directly with length. With the starting stem and footing, a 10 ft wall needs 1.77 yd³, a 20 ft wall needs 3.53 yd³ and a 30 ft wall needs 5.30 yd³.
How much does a wider footing add?
On a 20 ft wall, widening the footing from 24 in to 30 in raises the total from 3.53 yd³ to 3.87 yd³. Narrowing it to 18 in lowers it to 3.19 yd³.
What does the waste allowance cover on a retaining wall pour?
It covers spillage, trench irregularities, form movement and leftover concrete. The calculator applies it to the stem and footing together, and you can raise or lower it to suit how tidy the excavation is.