The Small Bathroom Remodel Cost Calculator estimates the cost of remodeling a compact full bathroom or a half bath (powder room). It prices floor and wall tile by the installed square foot, adds the vanity, toilet and — for full baths — the tub or shower, then other labor and a contingency.
Small Bathroom Remodel Cost Calculator
Estimate the cost to remodel a small bathroom or half bath — fixtures, tile by the square foot and labour.
Switching to half bath removes the tub/shower cost. Every price is an example; enter quotes from local suppliers and contractors.
Formula
Tile = (L × W + wall tile area) × installed tile rate
Fixtures = vanity + toilet + tub/shower (full bath only)
Total = (tile + fixtures + other labor) × (1 + contingency)
How the Calculation Works
Step 1: Add floor area and wall tile area and multiply by the installed tile rate.
Step 2: Add fixture prices (the tub/shower only for a full bath).
Step 3: Add other labor (plumbing, electrical, paint) and the contingency.
Example Calculation
Given (example prices): 7 × 5 ft full bath, 60 ft² of wall tile at $18/ft² installed, vanity $700, toilet $300, tub/shower $1,500, other labor $2,500, 10% contingency
- Tile = (35 + 60) × 18 = $1,710
- Fixtures = 700 + 300 + 1,500 = $2,500
- Subtotal = 1,710 + 2,500 + 2,500 = $6,710
- Total = 6,710 × 1.10 = $7,381
As a half bath (no tub/shower), the total becomes (1,710 + 1,000 + 2,500) × 1.10 = $5,731.
Ways to Keep a Small Remodel on Budget
- Keep the toilet, sink and shower in the same places to avoid moving plumbing.
- Limit full-height tile to the wet area and paint the rest.
- Choose standard-size fixtures that fit existing openings.
Frequently Asked Questions
How much does it cost to remodel a small bathroom?
Tile + fixtures + labor + contingency; the calculator adds your local prices.
What is a half bath?
A toilet and sink without a tub or shower, also called a powder room.
How do I measure wall tile area?
Length of tiled wall × tile height, minus openings; use the Bathroom Tile Calculator for details.
What is included in “other labor”?
Plumbing hookups, electrical, drywall repair and painting not already in the tile rate.
Why add contingency?
Removing old finishes can reveal damage that must be repaired.
