Riprap is bought by the ton and placed by the cubic yard, so the order depends on the area, the layer thickness and the weight of the stone. Enter these and this calculator returns the volume, the weight and the number of truck loads.
Riprap Calculator
Riprap volume, weight and truck loads for a slope, bank or channel lining from its length, width, thickness and stone weight.
Starting values: the calculator opens in US units with a length of 100 ft, a width of 10 ft, a thickness of 18 in, a stone weight of 1.4 tons per cubic yard, a 10% allowance and a 20 ton truck. It returns 1,000 sq ft, 61.1 cubic yards, 85.6 tons and 5 truck loads. The stone weight is an example, so use the placed weight your supplier quotes.
The formulas
Area = Length × Width
Volume = Area × Thickness
Weight = Volume × Stone weight per unit volume
Order = Weight × (1 + Allowance ÷ 100)
Truck loads = Order ÷ Truck capacity, rounded up
In US units, the thickness in inches is divided by 12 to get feet, and the volume in cubic feet is divided by 27 for cubic yards. In metric units, the thickness in centimetres is divided by 100, the volume is in cubic metres and the weight is in tonnes per cubic metre.
Worked examples
Example 1: the default
100 × 10 = 1,000 sq ft. 1,000 × 1.5 ft = 1,500 cu ft, which is 55.56 cubic yards. At 1.4 tons per cubic yard, the weight is 77.8 tons. With a 10% allowance, 85.6 tons and 61.1 cubic yards. 85.6 ÷ 20 = 4.3, so 5 truck loads.
Example 2: without the allowance
The same job at 77.8 tons needs 77.8 ÷ 20 = 3.9, which is 4 loads. The allowance for settling, waste and uneven ground takes you to a fifth load.
Example 3: a thicker layer
At 24 in the volume is 1,000 × 2 = 2,000 cu ft, or 74.07 cubic yards. Weight = 74.07 × 1.4 = 103.7 tons, and 114.1 tons with the allowance. That is 5.7 loads, so 6.
Example 4: metric
A 30 m by 3 m bank is 90 sq m. At 45 cm thick, the volume is 40.5 cubic metres. With an example weight of 1.7 tonnes per cubic metre, the weight is 68.9 tonnes, and 75.7 tonnes with a 10% allowance. At 20 tonnes a load, that is 4 truck loads. The calculator also shows the US equivalent of each figure.
Choosing the thickness and stone
The thickness and stone size are design decisions. A county stormwater design manual says the layer should generally be twice the median stone diameter, written D50, or at least as thick as the largest stone. For stone of D50 of 9 in, that is 18 in, the calculator’s default. The manual also asks for a reasonably well-graded mix, with the largest stone no more than 1.25 to 1.5 times D50, and says the median stone weight is chosen using US Army Corps of Engineers criteria. In highly turbulent places, such as culvert outfalls, the median stone weight should be increased from 200% to 600% depending on how severe the turbulence is.
What the calculator needs from you
- The dimensions of the area to be covered, measured along the slope.
- A thickness from your design or specification.
- The placed weight per unit volume from your supplier, which differs by stone.
- The truck’s legal load, not just its size.
Ordering tips
- Keep the allowance. Settling, uneven ground and waste make a small shortfall likely.
- Check whether the supplier prices by the ton or by the cubic yard and use the matching output.
- Ask for the stone gradation to match your design.
- Check whether a filter layer or fabric is also needed under the stone. The manual I read does not cover it, so follow your design.
What the calculator does not do
- It does not choose stone size or thickness.
- It treats the area as a flat rectangle, so for a slope measure the length along the slope.
- It does not include a filter layer, fabric or toe trench.
- It does not know the stone weight. The 1.4 default is an example only.
Irregular areas and a thinner layer
The calculator takes one length and one width. For a bank that changes width, split it into rectangles, work out each area and add them before you decide on a single average width.
Example 5: two sections
A section 40 ft by 8 ft is 320 sq ft and a section 30 ft by 6 ft is 180 sq ft, a total of 500 sq ft. At 18 in thick, the volume is 750 cubic feet, or 27.78 cubic yards. At 1.4 tons per cubic yard that is 38.9 tons, and 42.8 tons with a 10% allowance. At 20 tons a load, that is 2.1 loads, so 3 loads.
Example 6: a thinner layer
On the default 1,000 sq ft area, a 12 in layer is 1,000 cubic feet, which is 37.04 cubic yards. At 1.4 tons per cubic yard that is 51.9 tons, and 57.1 tons with the allowance. That is 2.9 loads, so 3 loads, compared with 5 for the default. The thickness has a large effect, so confirm it from your design.
Reading the truck-load figure
The load count is the order divided by the truck size, rounded up, so the last truck may be only partly full. If the rounding leaves a nearly empty truck, check whether a small change to the allowance or the area is reasonable, and ask the supplier about their minimum load.
Frequently asked questions
How do I calculate how much riprap I need?
Multiply length by width for area, then by thickness for volume, then by the stone weight per unit volume. Add an allowance and divide by the truck capacity for loads.
How thick should a riprap layer be?
One county manual says generally twice the median stone diameter, or at least as thick as the largest stone. Follow your design or specification.
What stone weight should I enter?
Use the placed weight your supplier quotes. The default of 1.4 tons per cubic yard is an example only.
Why add an allowance?
Settling, uneven ground and waste make a small shortfall likely, and 10% is the calculator’s starting value.